Solving your biggest problem - fast.
I provide on-site Lean Six Sigma consulting to Cleveland-area manufacturers, focusing on the eastern industrial corridor from Euclid to Solon, and to the south and east. With over 10 years experience in manufacturing, I've delivered as much as $954k/week in revenue recovery through systematic waste elimination and defect reduction.
Cleveland's diverse manufacturers, from Lincoln Electric's welding systems in Euclid to precision manufacturers in Solon, face unique challenges:
Aging workforce requiring process standardization before retirement
Legacy equipment needing optimization without full replacement
Automotive supplier pressures demanding higher quality at lower costs
Medical device regulations requiring documented process control
Steel price volatility necessitating waste reduction to maintain margins
Define: I map your current state, identifying the gap between where you are and where Cleveland's top performers operate. And I ask questions. Lots of questions. This is where the magic really begins.
Measure: Using data from your floor, not assumptions. Real cycle times, actual defect rates, true OEE.
Analyze: Root cause analysis using fishbone diagrams, 5 Whys, and statistical analysis to find the real problems—not symptoms.
Improve: Implement solutions that stick. No consultant theater—just practical improvements your team can sustain.
Control: Create visual management and standard work that maintains gains after I leave.
Recent projects within 25 miles of Aurora:
Solon medical devices: 90% QA Improvement
Aurora electrical power equipment: $954k/week revenue rescue
Cleveland transportation equipment: 4x capacity via Assembly line creation
Chagrin Falls consumer goods: 57% Labor reduction, +60% throughput
Transportation Equipment
Metal fabrication and stamping
Injection molding and plastics
Medical device manufacturing & testing
PCB Assembly & Conformal Coating
Medium and Large scale assemblies, DFM, DFA, Assembly Optimization
Industrial equipment OEMs
Food and beverage processing
Local presence: Based in Aurora, I'm on-site within 60 minutes for any emergency in Cleveland's east side industrial areas.
No travel charges: Unlike consultants from further away, no hotel bills or mileage charges for Cleveland-area projects.
Manufacturing background: I've worked in Cleveland-area plants, not just consulted in them. I know the reality of manufacturing. My first job was loading and unloading a stamping machine all day, every day, in an expanded metal factory.
Rapid implementation:
75% of improvements implemented or initiated within 10 business days,
100% within 30 days.
Google My Business - Mitch Robinson Manufacturing Solutions Consulting
I provide daily on-site engineering support to manufacturers in:
Coming soon to Stark County, Canton, Cleveland's west side, Parma, Medina, Brecksville, Strongsville, and more.
Project-based: Fixed-fee projects targeting specific problems
Weekly support: Regular on-site presence for continuous improvement (most common)
Training programs: Build internal Lean Six Sigma capability
Rapid improvement events: 3-5 day focused kaizens
Most common: Monthly service: Consulting Rates
Call 330-732-5744 to set up an interview.